Pricing · Bid value reviewed
No seats to count, no page caps, no second invoice when you re-bid a job. One published rate all the way to $80M of bid value, shown next to what a review is worth on the work you actually build.
$3,600
Entry minimum / yr
Unlimited
Estimator seats
Once
A re-bid is counted
Try it on your first 5 projects free. No credit card required.
Price it yourself
Slide to the bid value you'll put through Makeoff in a year. Nothing else moves the price.
Graded against a closed job
A contractor wrote up every dollar one closed job leaked, then fed the original bid set to Makeoff and graded the review against that log, line by line. Default settings, no custom agents, no tuning to the project. Their dispositions, not ours.
37%
Caught on defaults
27%
Reachable once calibrated
37%
Outside document review
01
The answer key came first
A post-job margin log built from job records, backcharges and labor hours, written before we were involved.
02
The review ran blind
94 issues surfaced from the drawings, the specification and the takeoff, on default configuration throughout.
03
They marked every line
46 log items called caught, reachable, or beyond what a document review should attempt. Nothing was self-awarded.
What it's worth to you
The study's proportions, applied to your book of work. Bid volume and win rate set the revenue you actually build. The leak rate and catch rate come fixed from the study. You decide how much of a flag turns into a changed bid, and the price reads straight off the published rate.
The rate card
This table is the entire price list. $150 per $1M reviewed, from your first bid to $80M. Nothing to negotiate at signing, nothing to re-argue at renewal. Past $80M the shape of the work changes enough that we price it with you.
Volume
Rate / $1M
Annual
Monthly
Typical contractor
First $20M
$150
$3,600 min
$330
1 to 3 estimators · single office
$20M to $40M
$150
$6,000
$550
3 to 6 estimators
$40M to $60M
$150
$9,000
$825
6 to 10 estimators · one region
$60M to $80M
$150
$12,000
$1,100
10 to 15 estimators · multi-office
Above $80M
Negotiated
Enterprise
—
Contact us for enterprise pricing
One rate applies throughout: $150 per $1M reviewed. The annual column is that rate at the top of each band, except the first, where the $3,600 minimum is higher than $20M would otherwise cost. Monthly billing carries a 10% premium.
Minimum
$3,600 / yr
Above $80M reviewed
Enterprise
2-year term
−5%
3-year term
−8%
Monthly billing
+10%
Every subscription includes
Core scope review
Contradictions, missing items, line-item issues and code-risk flags across the plan set and specification.
A citation on every finding
Spec section and sheet number on each issue, so your estimator can check it in the documents.
Unlimited estimators
Fair use. No seat count to administer, no license to move when someone changes office.
No rip-and-replace
Accubid and McCormick stay where they are. Makeoff is the second set of expert eyes on the package.
The on-ramp
Three months, unlimited bid value, nothing metered. Run the packages you already know the answers to and count what the review would have caught while the bid was still open.
$5,000
3 months
Unlimited bid value, nothing metered
Unlimited estimators for the term
Converts any time in month three
The fee credits to your first annual invoice
Questions estimators ask
The total dollar value of the bid documents you upload in the contract period. Where a package carries no stated value, we take square footage from the drawings and apply the low band of the published cost range for that project type. You can override that figure at upload if your estimating system has a firmer number, and projects under $500,000 in bid value don't count against your commit at all.
No. A project counts once, however many times you re-bid it. If the scope grows between versions, the bid value re-meters up to the largest version we have seen, and you are still billed for that project once.
Your meter is visible all year, and at 80% of your committed volume we get in touch rather than letting it turn into a surprise invoice. From there you either move up a band for the rest of the term or true it up at renewal, whichever costs you less. Past $80M of bid value the rate is negotiated with you rather than read off this page.
No. SD, DD and CD drawings for the same job are one project. So are basis-of-design documents, addenda, RFI responses, and re-processing documents already in the system. Only a genuinely different project creates a new count.
Roughly a third of what went wrong on the job in the study was never visible in the documents: field conditions, productivity, and coordination problems that only appear once the work starts. Makeoff reads what is written down. It does not price labor, judge crew performance, or see what happens on site.
Twenty minutes
Twenty minutes, your own plan set, findings with citations you can check the same afternoon.
First 5 projects free · No credit card